A restaurant closed for renovation, and 50 boxes
The owner was refitting the space. Kitchen, furniture, crockery, machines and the ceiling lights all had to be out before the builders arrived. This is that job, photographed on site, nothing staged.

The job in short
- We started after closing, at half past nine at night, across two nights.
- 50 boxes plus the kitchen equipment.
- Every piece washed and dried before it went in a box.
- Machines stretch-wrapped, with loose parts stripped off and packed first.
- Every box carries its own barcode, scanned into the catalogue on site.
- When the restaurant reopens we deliver it back and set it up on request.
Why a restaurant is harder than a house
A flat holds furniture, clothes and a box of paperwork. A restaurant holds stacked crockery, heavy pans, mains-powered stainless machines, tables that come apart and a dry store. Each group needs different handling, and all of it has to happen inside the hours the place is not trading.
Builders do not wait. The day they start is the day the space has to be empty. If things are still in there, either the build slows down or everything gets pushed into a corner under a sheet, and two months later you find out what did not survive.

Night one: the kitchen
The kitchen goes first, because it is where the grease is and where the damage happens in storage. Tools were washed, racked to drain, then dried by hand. Pans and glass lids were cleaned of oil before they went anywhere near a box.
This is not about appearances. A thin film of oil left on stainless steel turns tacky and sour after eight weeks on a shelf, and the smell moves to everything sharing the box. A bowl packed damp grows mould. Storing kitchen equipment is a drying job first, and there is no shortcut through it.


Machines: strip the loose parts, then wrap
The dough sheeter, the steamer cabinet and the induction tops all followed the same order. Unplug, let it cool properly, take off every loose part and wrap those separately, dry it, and only then run stretch film around the body.
Loose parts are what goes missing: blades, trays, racks, adjustment screws. They do not get thrown into a shared anonymous box. Each set travels with its own machine, because in two months nobody remembers which blade belongs to which body.


Night two: the dining room
Table tops came off their pedestals, stacked with padding between them. Chairs stacked. The ceiling lights, both the track heads and the pendants, came down and were boxed separately.
Lighting is the thing people forget. It feels like part of the building, so they assume it stays, but the painters and ceiling crew will take it down anyway, and a light fitting that spends two months on a building site floor is not the same fitting afterwards.

50 boxes, and why each one has a code
Our standard box is 60 × 40 × 40 cm. This job took 50 of them, plus the kitchen equipment, which travels separately because machines do not go in boxes.
Every box carries a pre-printed barcode. The crew scans it with a phone on site, photographs what went in, and that box appears in the customer account before the van leaves. There is no data-entry step afterwards, because the data-entry step afterwards is the one nobody does.

What has not happened yet: the return and the reinstall
The renovation is still running. The second half of this job is reopening day: we bring it back, put it in the right areas, refit the furniture and the lighting, and hand over against the same list that was scanned during the pack.
That list is why the second half is fast. Reopening against a photographed inventory is a different job from reopening against the memory of someone who left last month.
How it is priced
There is no separate restaurant price list. It is the one published on this site: counted in boxes, rented by the month, with a one-off collection fee. A Large plan is 48 boxes, so a 50-box job sits just above it.
| Size | Boxes | Roughly | Valet / month | Self storage / month |
|---|---|---|---|---|
| Small | 12 | a studio, seasonal things | 1,250,000 VND / 1,550,000 VND | 1,550,000 VND / 1,950,000 VND |
| Medium | 24 | a one-bedroom home | 2,450,000 VND / 3,050,000 VND | 3,050,000 VND / 3,800,000 VND |
| Large | 48 | a two to three bedroom home | 4,900,000 VND / 6,150,000 VND | 6,150,000 VND / 7,700,000 VND |
| Size | Collection only | Collection and return |
|---|---|---|
| Small | 3,300,000 VND | 5,100,000 VND |
| Medium | 6,000,000 VND | 8,900,000 VND |
| Large | 11,300,000 VND | 16,600,000 VND |
Air-conditioned storage holds 23 to 25°C. For wood, electronics and stainless machines sitting through the rainy season, that difference is worth paying.
If your place is about to be refitted
- Book 2 days ahead. Sooner than that carries a rush fee of 400,000 VND.
- Pick the night after your last service, not the morning the builders arrive.
- Tell us which items have to come back before reopening; those get stored at the front.
- We collect anywhere in Districts 1 to 5, Binh Thanh, Phu Nhuan and Go Vap with no travel charge; other districts add 150,000 VND per trip.
Tủ Mây price list · standard / air-conditioned
Frequently asked
Do you work after closing time?
Yes. This job started at half past nine at night and ran past midnight. The restaurant did not lose a trading day.
Do you take kitchen machinery?
Yes. Machines are unplugged, cooled, stripped of loose parts, dried and stretch-wrapped. The loose parts travel with their own machine.
Can we get a few items back mid-storage?
Yes. Pick them in your account and book a delivery, 100,000 VND per item. You do not have to take back the whole lot.
Will you set it back up when we reopen?
Yes, on request. We deliver back, place it by area and refit the furniture and lighting, checked against the list scanned during the pack.
What if the renovation runs long?
Storage is month to month with no fixed term. Another month of building is another month of storage, not a new contract.
Store it, get it back when you need it
We come to you, pack, photograph every item and keep it on a secure shelf, standard or air-conditioned. One message brings any of it back.
Keep reading
- Storage for restaurants and cafesStorage for restaurants, cafes and bars in Ho Chi Minh City: temporary closure, a refit, a move…
- Closed for now, not for goodA shop, gym, salon or small office pausing for a season or a year: keep the fit-out and the…
- Packing commercial kitchen equipment for storageStainless ranges, steamer cabinets, dough sheeters, pans and pots: how to unplug, strip, dry…
- Restaurant furniture: store it or sell itClosing for a few months of building work: is it cheaper to store the furniture or sell it off…